(Hurry and own your business) (10 days and it will be ready)
(Quality in our work)
Preparing a 6-meter container..
1- Making cement boards inside.
2- Complete thermal insulation.
3- Electrical installation and plumbing installation.
4- Installing ceramic flooring.
5- Painting inside and outside.
6- Installing a 1.5-ton split air conditioner.
7- Manufacturing and installing aluminum and glass (double).
8- Interior and exterior lighting, installing a main panel and internal sockets.
9- Installing inside (stainless steel) or (chipboard) or (wood alternative) or (marble alternative), depending on your business.
10- Establishing wires for surveillance cameras.