#عرض#شغل#اليد#نص#ريال#للمتر#المربع
1 We do excellent surface preparation.
2 We wash it after cleaning to ensure cleanliness.
3 We fill cracks with epoxy material along with the corners.
4 We apply a base coat of Super thermal waterproofing material.
Then we wait for it to dry for 3 or 4 hours because it is a light base coat.
5 We apply a second coat of American waterproofing material if the customer wants, with fiberglass mesh or without.
6 Then we apply the final protective layer of American Super Waterproofing material, with a ten-year warranty.
#المعلم #ابومحمد For contact and inquiries, call the same number. We go to all areas of the Eastern Province at the same price.
#الخبر #الدمام #الجبيل #القطيف#سيهات #راس#تنوره #الاحساء#صفوا