In the name of God, the Most Gracious, the Most Merciful.
First, inspection with the device on concrete columns and electricity.
And then, demolition and breaking of concrete and block walls, widening windows and doors and AC openings, and construction of annex rooms, lounges, and fences, and breaking tiles and installing tiles, plumbing, and paints.