نوع العرض: ابحث عن عمل
المستوى المهني: متقدم
نوع العقد: دوام كامل
المؤهلات المطلوبة: بكالوريوس
1. Reviewed engineering drawings, layouts, legal scopes, and reinforcement details before execution and concrete pouring to reduce rework and site errors.
2. Coordinated daily multidisciplinary site operations across Structural, Architectural, and MEP works to ensure seamless project execution.
3. Controlled project visibility by managing comprehensive site records, daily reports, and real-time cost updates.
4. Performed quality control inspections to ensure materials and workmanship met project specifications and construction standards.
5. Collaborated with architects, project managers, contractors, and suppliers to resolve technical issues, update design drawings, and maintain project schedules.
6. Checked the daily work of contractors to make sure the quality stayed high and gave expert advice to work teams and outside helpers to solve site problems fast.
7. Kept a close eye on the project costs and daily schedules to prevent costly delays.
8. Analyzed construction blueprints and technical specifications to build precise material takeoff lists.
9. Performed precise quantity take-offs from architectural and engineering drawings using standard measurement methods.
10. Prepared detailed BOQs and cost estimates for materials, labor, and subcontractor services to optimize project budgeting and procurement.
11. Negotiated with 15+ material suppliers to secure bulk pricing, reducing total project procurement costs by 12%.
12. Coordinated deliveries with concrete, rebar, and specialty vendors to meet strict site timelines and eliminate project delays.
13. Prepared and revised architectural floor plans, elevations, and structural reinforcement drawings to align with client requirements and site conditions.
14. Extracted structural steel quantities and prepared bar bending schedules (BBS) to support procurement planning and site execution.
15. Took and verified physical measurements from site against approved drawings and project specifications.
16. Prepared running account bills based on the progress of work at the site and made payment to the contractor as per the bill.
17. Maintained and updated Bills of Quantities (BOQ), performed rate analysis, and tracked variation or extra work orders.
18. Prepared monthly reconciliation statements for building materials to improve material tracking and cost control.